Register of Balanced users – updated 25th November 2024 |
Reg. number |
The date of submission of the application for entry into the register |
Users data (name, city and address) |
Power plant name and power |
Certificate of completed ETRP audit |
Connection conditions |
Relevant documentation issued by the competent institutions of the entity or Brčko District |
The date of submission of the request for data change or deletion from the register |
Note |
01 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
HPP Bočac, 2x55 MW |
- |
- |
- |
- |
electric power producer |
02 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
PHPP Čapljina, 2x220 MW |
- |
- |
- |
- |
electric power producer |
03 |
- |
Hidroinvest Ltd Rogatica, Dub nn, Rogatica |
HPP Dub, 2x4,7 MW |
- |
- |
- |
- |
electric power producer |
04 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
HPP Dubrovnik, 1x108+1x126 MW |
- |
- |
- |
- |
electric power producer |
05 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
TPP Gacko, 300 MW |
- |
- |
- |
- |
electric power producer |
06 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
HPP Grabovica, 2x57 MW |
- |
- |
- |
- |
electric power producer |
07 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
HPP Jablanica, 6x30 MW |
- |
- |
- |
- |
electric power producer |
08 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Jajce I, 2x30 MW |
- |
- |
- |
- |
electric power producer |
09 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Jajce II, 3x10 MW |
- |
- |
- |
- |
electric power producer |
10 |
- |
FL Wind, Eminovo selo nn, Tomislavgrad |
WPP Jelovača, 18x2 MW |
- |
- |
- |
- |
electric power producer |
11 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
TPP Kakanj, 2x110+1x230 MW |
- |
- |
- |
- |
electric power producer |
12 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
WPP Mesihovina, 22x2,3 MW |
- |
- |
- |
- |
electric power producer |
13 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Mostar, 3x24 MW |
- |
- |
- |
- |
electric power producer |
14 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Mostarsko Blato, 2x30 MW |
- |
- |
- |
- |
electric power producer |
15 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Peć-Mlini, 2x15,3 MW |
- |
- |
- |
- |
electric power producer |
16 |
- |
DRIN Energija Ltd Grude |
SPP Petnjik, 29,2 MW |
- |
- |
- |
- |
electric power producer |
17 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
WPP Podveležje, 15x3,2 MW |
- |
- |
- |
- |
electric power producer |
18 |
- |
PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A |
HPP Rama, 1x80+1x90 MW |
- |
- |
- |
- |
electric power producer |
19 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
HPP Salakovac, 3x70 MW |
- |
- |
- |
- |
electric power producer |
20 |
- |
EFT Rudnik i TE Stanari Ltd Stanari |
TPP Stanari, 300 MW |
- |
- |
- |
- |
electric power producer |
21 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
HPP Trebinje I, 2x54+1x63 MW |
- |
- |
- |
- |
electric power producer |
22 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
TPP Tuzla, 1x100+2x200+1x223 MW |
- |
- |
- |
- |
electric power producer |
23 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
TPP Ugljevik, 300 MW |
- |
- |
- |
- |
electric power producer |
24 |
- |
Hidroinvest Ltd Rogatica, Dub nn, Rogatica |
HPP Ustiprača, 2x3,74 MW |
- |
- |
- |
- |
electric power producer |
25 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
HPP Višegrad, 3x105 MW |
- |
- |
- |
- |
electric power producer |
26 |
- |
Aluminij Industries Ltd, Mostar, Baćevići nn |
Aluminij Mostar |
- |
- |
- |
- |
electric power consumer |
27 |
- |
PLC Željeznice FBiH Ltd, Musala 2, Sarajevo |
Željeznice FBiH |
- |
- |
- |
- |
electric power consumer |
28 |
- |
Arcelor Mittal, Bulevar Kralja Tvrtka I, Zenica |
Arcelor Mittal |
- |
- |
- |
- |
electric power consumer |
29 |
- |
Heidelberg Materials Jsc, Selima efendije Merdanovića 146, Kakanj |
Cementara Kakanj |
- |
- |
- |
- |
electric power consumer |
30 |
- |
KTK Visoko Jsc, Sarajevska nn, Visoko |
KTK Visoko |
- |
- |
- |
- |
electric power consumer |
31 |
- |
FL Wind Ltd, Eminovo selo nn, Tomislavgrad |
FL Wind |
- |
- |
- |
- |
electric power consumer |
32 |
- |
Toplana Zenica Ltd, Bulevar Kralja Tvrtka I 17, Zenica |
Toplana Zenica |
- |
- |
- |
- |
electric power consumer |
33 |
- |
Prevent CEE, Bulevar Meše Selimovića 16, Sarajevo |
Prevent CEE |
- |
- |
- |
- |
electric power consumer |
34 |
- |
Željezara Ilijaš Jsc, Bosanski put 215, Ilijaš |
Željezara Ilijaš |
- |
- |
- |
- |
electric power consumer |
35 |
- |
FG Birač, Karakaj nn, Zvornik |
FG Birač Zvornik |
- |
- |
- |
- |
electric power consumer |
36 |
- |
Željeznice Republike Srpske, Svetog Save 71, Doboj |
Željeznice RS |
- |
- |
- |
- |
electric power consumer |
37 |
- |
Metalleghe Silicon Ltd, Bjelajce nn, Mrkonjić Grad |
Metalleghe Silicon |
- |
- |
- |
- |
electric power consumer |
38 |
- |
EFT-HE Ulog, Kalinovik, Karađorđeva 19 |
HPP Ulog, 35,12 MW |
08-2011 |
12.10.2023. |
- |
- |
balanced by IPRP 2024-2033 |
39 |
- |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
HPP Janjići, 15,8 MW |
482-1/22 |
17.05.2022. |
- |
- |
balanced by IPRP 2024-2033 |
40 |
- |
MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn |
HPP Dabar, 159,15 MW |
247-1/22 |
16.05.2022. |
- |
- |
balanced by IPRP 2024-2033 |
41 |
- |
TO Zenica, Bulevar Kralja Tvrtka I 17, Zenica |
HP Zenica, 14,45 MW |
1472-2/19 |
29.04.2022. |
- |
- |
balanced by IPRP 2024-2033 |
42 |
- |
Tomislavgrad-Kupres, Put Kola 6, Tomislavgrad |
WPP Baljci, 48 MW |
20-2015 |
06.07.2021. |
- |
- |
balanced by IPRP 2024-2033 |
43 |
- |
Relaks, Vinjani nn, Posušje |
WPP Oštrc, 29,8 MW |
06-1489-1/22 |
12.10.2023. |
- |
- |
balanced by IPRP 2024-2033 |
44 |
- |
Vjetroelektrana Grebak, Nevesinjskih ustanika 68, Nevesinje |
WPP Grebak, 66 MW |
1293-3/21 |
03.05.2023. |
- |
- |
balanced by IPRP 2024-2033 |
45 |
- |
VE Ivovik, Maršala Tita 30/IV, Sarajevo |
WPP Ivovik, 84 MW |
428-2/21 |
27.12.2022. |
- |
- |
balanced by IPRP 2024-2033 |
46 |
- |
Vjetropark Interwind, Hadželi 129, Sarajevo |
WPP Ivan sedlo, 25 MW |
1042-3/21 |
28.10.2021. |
- |
- |
balanced by IPRP 2024-2033 |
47 |
- |
FL Wind, Eminovo selo nn, Tomislavgrad |
WPP Tušnica, 72,6 MW |
06-220-3/24 |
22.05.2022. |
- |
- |
balanced by IPRP 2024-2033 |
48 |
- |
Imres, Župana Želimira nn, Livno |
WPP Široka Draga, 125,4 MW |
06-1214-2/22 |
29.11.2023. |
- |
- |
balanced by IPRP 2024-2033 |
49 |
- |
Vjetroelektrane, Junuza Duruta nn, Glamoč |
WPP Dževa, 46 MW |
06-743-2/22 |
12.07.2022. |
- |
- |
balanced by IPRP 2024-2033 |
50 |
- |
EFT SE Bileća, Srpske vojske 9, Bileća |
SPP Bileća, 55 MW |
1045-1/21 |
27.04.2023. |
- |
- |
electric power producer |
51 |
- |
SE Trebinje 1, Stepe Stepanovića nn, Trebinje |
SPP Trebinje 1, 118,8 MW |
709-3/21 |
12.03.2024. |
- |
- |
new power 118,8 MW |
52 |
- |
ECO-WAT, Josipa Bana Jelačića nn, Kiseljak |
SPP Eco-Wat, 92,47 MW |
376-1/22 |
04.05.2023. |
- |
- |
electric power producer 57 MW |
53 |
- |
Pozitron, Ortiješ nn, Mostar |
SPP Polog 1-8, 7,99 MW |
06-800-3/22 |
27.04.2023. |
- |
- |
balanced by IPRP 2024-2033 |
54 |
- |
Plavo Sunce, Tromeđa II 3, Čitluk |
SPP Plavo Sunce, 40 MW |
06-800-3/22 |
08.11.2023. |
- |
- |
balanced by IPRP 2024-2033 |
55 |
- |
ASTERA, Šušnjari nn, Posušje |
SPP Astera, 25 MW |
06-742-2/22 |
10.08.2023. |
- |
- |
balanced by IPRP 2024-2033 |
56 |
12.12.2023. |
PLC EP HZHB, Mostar, Kralja Petra Krešimira IV 6-A |
SPP EP HZHB1, 150 MW |
06-1019-1/23 |
21.07.2023. |
Connection conditions, Energy permit ED-1864/23 |
- |
- |
57 |
11.01.2024. |
AURORA SOLAR Ltd, Stolac, Kneza Domagoja nn |
SPP Stolac solar 01-1 to 01-22, 103,15 MW |
06-546-1/23 |
11.05.2023. |
Connection conditions, Energy permits from ED-1664/23 to ED-1685/23 |
- |
- |
58 |
12.01.2024. |
MET Consulting Ltd, Široki Brijeg, Trnska cesta 146 |
SPP Zvizdan, 28,5 MW |
06-827-2/23 |
30.05.2023. |
Connection conditions, Energy permit ED-1707/23 |
- |
electric power producer |
59 |
16.01.2024. |
ENERSTATE Ltd, Sokolac, Jove Jankovića nn |
SPP Sokolac, 100,8 MW |
06-1103-3/23 |
02.08.2023. |
Connection conditions, Concession contract 05.05/360-219-33/22 |
- |
- |
60 |
27.02.2024. |
ETMAX Ltd, Banja Luka, Poslovna zona Ramići nn |
SPP Nevesinje, SPP Nevesinje 1-14, MDD Energy, M Solar, 570 MW |
06-114-3/24 |
27.01.2023. |
Connection conditions, Concession contract March and October 2023 |
- |
- |
61 |
08.03.2024. |
Pozitron Ltd, Mostar, Ortiješ nn |
SPP Liwno 1 - SE Liwno 6, 27 MW |
06-1120-3/23 |
08.01.2023. |
Energy permits from ED-1869/24 to ED-1874/24 |
- |
- |
62 |
26.03.2024. |
B&B sunce vjetar Ltd, Banja Luka, Bulevar srpske vojske 17 |
SPP and WPP Planik 80+36 MW |
06-259-3/24 |
13.03.2024. |
Connection conditions, Concession contracts 05.05/360-161-60/21 and 05.05/360-161-61/21 |
- |
- |
63 |
29.03.2024. |
DELING INVEST Ltd, Tuzla, Šići nn |
SPP DELING INVEST 1, 29,75 MW |
06-1956-2/23 |
17.01.2024. |
Connection conditions, Energy permit ED-1909/24 |
- |
electric power producer |
64 |
01.04.2024. |
FOTONAPONSKA ELEKTRANA 2 Ltd, Trebinje, Stepe Stepanovića nn |
SPP Trebinje 2, 48,7 MW |
06-335-3/24 |
12.03.2024. |
Connection conditions, Contract on Assignment of Concession contract, Concession contract 05.05/012-1664-41/20 |
- |
- |
65 |
04.04.2024. |
Solario Ltd, Mostar, Dubrovačka 134A |
SPP Solario 1 and 2, 4 + 4 MW + 11, 4378 MW (power plants less than 1 MW) |
06-678-2/23 |
05.06.2023. |
Energy permits ED-1894/24 and ED-1895/24, Declarations of unnecessity of an energy permit for power plants less than 1 MW |
- |
- |
66 |
13.05.2024. |
TPC Ltd Sarajevo, Avdage Šahinagića 9/1 |
SPP TOP PRO 1-4, 3 MW (power plants less than 1 MW) |
06-535-1/24 |
11.04.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW |
- |
- |
67 |
14.05.2024. |
SOLARIO Ltd Mostar, Dubrovačka 134A |
SPP Solario 3-12, 9,99 MW (power plants less than 1 MW) |
06-684-1/24 |
10.05.2024. |
Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW |
- |
- |
68 |
24.05.2024. |
HL 001 Group Ltd Mostar, Braće Fejića nn |
SPP HL 31-60, 29,7 MW (power plants less than 1 MW) |
06-799-2/24 |
22.05.2024. |
Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
69 |
11.07.2024. |
SOLARNI VJETAR Ltd Mostar, Ortiješ nn |
SPP Solarni vjetar 1-12, 60 MW |
06-1819-1/23 |
08.02.2024. |
Connection conditions, Energy permits from ED-1897/24 to ED-1908/24 |
- |
- |
70 |
11.07.2024. |
NSOL Ltd Mostar, Vukovarska nn |
SPP Brotnjo 1 and 2, 9,98 MW |
06-1603-3/23 |
04.12.2023. |
Connection conditions, Energy permits ED-1913/24 and ED-1914/24 |
- |
- |
71 |
18.07.2024. |
ECCO SOLAR ENERGY Ltd Čitluk, Broćanski trg 1 |
SPP MI SOLIS 1-36, 35,64 MW (power plants less than 1 MW) |
06-1011-2/24 |
17.07.2024. |
Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
72 |
18.07.2024. |
IM SUNCE Ltd Čitluk, Broćanski trg 1 |
SPP MI SOLIS 37-42, 5,94 MW (power plants less than 1 MW) |
06-1011-2/24 |
17.07.2024. |
Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
73 |
23.07.2024. |
PLC EP HZHB, Mostar, Kralja Petra Krešimira IV 6-A |
WPP Poklečani, 132MW |
06-1149-3/23 |
10.07.2024. |
Amendment to the Connection conditions, Energy permit ED-00001-V-I-3/24 |
- |
- |
74 |
23.07.2024. |
Energy of the future Ltd Bijeljina |
SPP Bileća - Solar 1, 128,7MW |
06-455-1/24 |
27.03.2024. |
Connection conditions, Concession contract 05.05/012-612-9/24 |
- |
- |
75 |
29.07.2024. |
PLC Komunalno Ltd Mostar, Zagrebačka 2 |
SPP MO SOLAR 1-10, 49,9 MW |
06-1117-3/23 |
29.04.2024. |
Connection conditions, Energy permits from ED-1915/24 to ED-1924/24 |
- |
- |
76 |
02.08.2024. |
PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 |
SPP Gračanica 1 and 2, 2 x 22,5 MW |
06-352-3/24 |
21.05.2024. |
Connection conditions, Energy permit 05-13-1-24/24 |
- |
- |
77 |
12.08.2024. |
ECO-WAT, Josipa Bana Jelačića nn, Kiseljak |
SPP F1 and F4, 2 x 0,999 MW |
06-200-2/24 |
29.01.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW |
- |
- |
78 |
23.08.2024. |
RWP VITOROG Ltd Glamoč, Oštrin brijeg 24 |
WPP Škadimovac, 110 MW |
06-814-1/23 |
24.07.2023. |
Energy permit ED-1882/24 |
- |
- |
79 |
26.08.2024. |
ECO-WAT, Josipa Bana Jelačića nn, Kiseljak |
SPP F2 and F3, 2 x 4,9992 MW |
06-200-2/24 |
29.01.2024. |
Connection conditions, Energy permits ED-1910/24 and ED-1911/24 |
- |
- |
80 |
03.09.2024. |
MAJSKO SUNCE Ltd Čitluk, Broćanski trg 1 |
SPP MAJSKO SUNCE 3-11 and 13, 9,54 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
81 |
03.09.2024. |
IM SUNCE Ltd Čitluk, Broćanski trg 1 |
SPP LUCIA 1 and 2, 1,29 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
82 |
03.09.2024. |
ECCO SOLAR ENERGY Ltd Čitluk, Broćanski trg 1 |
SPP ESE 1-36, 35,64 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than1 MW, Urban permits |
- |
- |
83 |
03.09.2024. |
PREMIER ENERGY Ltd Čitluk, Kralja Tomislava 47 |
SPP PE 1-9, 8,91 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
84 |
04.09.2024. |
SOLARKO Ltd Čitluk, Broćanski trg 1 |
SPP SOLARKO 1-6, 5,94 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits |
- |
- |
85 |
04.09.2024. |
MS POWER Ltd Sarajevo, Hamze Čelenke 56 |
SPP SOLE 1-5, 4,95 MW (power plants less than 1 MW) |
06-1422-3/24 |
03.09.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urbani permits |
- |
- |
86 |
06.09.2024. |
ACIS BH Ltd Sarajevo, Derviša Numića 50 |
SPP ACIS 2, 0,99 MW |
06-290-3/24 |
08.03.2024. |
Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW |
- |
- |
87 |
09.09.2024. |
Solar Lena Ltd Grude, Blage Zadre 3 |
SPP Lena 2, 75 MW |
06-1026-2/23 |
24.08.2023. |
Connection conditions, Energy permit ED-1891/24 |
- |
- |
88 |
11.09.2024. |
MAJD 2 Ltd Ljubuški, Vukovarska 14 |
SPP Gaj 1 and 2, 4,1028 + 3,4801 MW |
06-176-1/24 |
12.03.2024. |
Connection conditions, Energy permits 05-13-1-341/24 and 05-13-1-342/24 |
- |
- |
89 |
11.09.2024. |
INOVACIJE Ltd Ljubuški, Klobuk 177 |
SPP Kravice 1 and 2, 18 + 26 MW |
06-1831-3/23 |
05.02.2024. |
Connection conditions, Energy permits 05-13-1-343/24 and 05-13-1-344/24 |
- |
- |
90 |
01.10.2024. |
IM SUNCE Ltd Čitluk, Broćanski trg 1 |
SPP IM SUNCE 2-3, 21-25 and SPP TERA 1-3, 36,851 MW |
06-1117-3/23 |
08.03.2024. |
Connection conditions, Energy permits 05-13-1-382/24 do 05-13-1-391/24, Urban permits |
- |
- |
91 |
01.10.2024. |
H&L "001" Ltd Mostar, Braće Fejića nn |
SPP HL 1-12, 54 MW |
06-934-3/23 |
02.08.2023. |
Connection conditions, Energy permits 05-13-1-347/24 do 05-13-1-358/24, Urban permits |
- |
- |
92 |
09.10.2024. |
Bioenergos TTS Ltd Banja Luka, Bulevar srpske vojske 17 |
SPP Borike, 232,2 MW |
06-862-1/24 |
07.06.2024. |
Connection conditions, Decision of the Government of the Republic of Srpska |
- |
- |