Registers

Balanced users


Register of Balanced users – updated 25th November 2024
Reg. number The date of submission of the application for entry into the register Users data (name, city and address) Power plant name and power Certificate of completed ETRP audit Connection conditions Relevant documentation issued by the competent institutions of the entity or Brčko District The date of submission of the request for data change or deletion from the register Note
01 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn HPP Bočac, 2x55 MW - - - - electric power producer
02 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A PHPP Čapljina, 2x220 MW - - - - electric power producer
03 - Hidroinvest Ltd Rogatica, Dub nn, Rogatica HPP Dub, 2x4,7 MW - - - - electric power producer
04 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn HPP Dubrovnik, 1x108+1x126 MW - - - - electric power producer
05 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn TPP Gacko, 300 MW - - - - electric power producer
06 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 HPP Grabovica, 2x57 MW - - - - electric power producer
07 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 HPP Jablanica, 6x30 MW - - - - electric power producer
08 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Jajce I, 2x30 MW - - - - electric power producer
09 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Jajce II, 3x10 MW - - - - electric power producer
10 - FL Wind, Eminovo selo nn, Tomislavgrad WPP Jelovača, 18x2 MW - - - - electric power producer
11 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 TPP Kakanj, 2x110+1x230 MW - - - - electric power producer
12 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A WPP Mesihovina, 22x2,3 MW - - - - electric power producer
13 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Mostar, 3x24 MW - - - - electric power producer
14 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Mostarsko Blato, 2x30 MW - - - - electric power producer
15 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Peć-Mlini, 2x15,3 MW - - - - electric power producer
16 - DRIN Energija Ltd Grude SPP Petnjik, 29,2 MW - - - - electric power producer
17 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 WPP Podveležje, 15x3,2 MW - - - - electric power producer
18 - PLC Elektroprivreda Hrvatske Zajednice Herceg Bosne, Mostar, Kralja Petra Krešimira IV 6-A HPP Rama, 1x80+1x90 MW - - - - electric power producer
19 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 HPP Salakovac, 3x70 MW - - - - electric power producer
20 - EFT Rudnik i TE Stanari Ltd Stanari TPP Stanari, 300 MW - - - - electric power producer
21 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn HPP Trebinje I, 2x54+1x63 MW - - - - electric power producer
22 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 TPP Tuzla, 1x100+2x200+1x223 MW - - - - electric power producer
23 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn TPP Ugljevik, 300 MW - - - - electric power producer
24 - Hidroinvest Ltd Rogatica, Dub nn, Rogatica HPP Ustiprača, 2x3,74 MW - - - - electric power producer
25 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn HPP Višegrad, 3x105 MW - - - - electric power producer
26 - Aluminij Industries Ltd, Mostar, Baćevići nn Aluminij Mostar - - - - electric power consumer
27 - PLC Željeznice FBiH Ltd, Musala 2, Sarajevo Željeznice FBiH - - - - electric power consumer
28 - Arcelor Mittal, Bulevar Kralja Tvrtka I, Zenica Arcelor Mittal - - - - electric power consumer
29 - Heidelberg Materials Jsc, Selima efendije Merdanovića 146, Kakanj Cementara Kakanj - - - - electric power consumer
30 - KTK Visoko Jsc, Sarajevska nn, Visoko KTK Visoko - - - - electric power consumer
31 - FL Wind Ltd, Eminovo selo nn, Tomislavgrad FL Wind - - - - electric power consumer
32 - Toplana Zenica Ltd, Bulevar Kralja Tvrtka I 17, Zenica Toplana Zenica - - - - electric power consumer
33 - Prevent CEE, Bulevar Meše Selimovića 16, Sarajevo Prevent CEE - - - - electric power consumer
34 - Željezara Ilijaš Jsc, Bosanski put 215, Ilijaš Željezara Ilijaš - - - - electric power consumer
35 - FG Birač, Karakaj nn, Zvornik FG Birač Zvornik - - - - electric power consumer
36 - Željeznice Republike Srpske, Svetog Save 71, Doboj Željeznice RS - - - - electric power consumer
37 - Metalleghe Silicon Ltd, Bjelajce nn, Mrkonjić Grad Metalleghe Silicon - - - - electric power consumer
38 - EFT-HE Ulog, Kalinovik, Karađorđeva 19 HPP Ulog, 35,12 MW 08-2011 12.10.2023. - - balanced by IPRP 2024-2033
39 - PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 HPP Janjići, 15,8 MW 482-1/22 17.05.2022. - - balanced by IPRP 2024-2033
40 - MH Elektroprivreda Republike Srpske, Trebinje, Vojvode Stepe Stepanovića nn HPP Dabar, 159,15 MW 247-1/22 16.05.2022. - - balanced by IPRP 2024-2033
41 - TO Zenica, Bulevar Kralja Tvrtka I 17, Zenica HP Zenica, 14,45 MW 1472-2/19 29.04.2022. - - balanced by IPRP 2024-2033
42 - Tomislavgrad-Kupres, Put Kola 6, Tomislavgrad WPP Baljci, 48 MW 20-2015 06.07.2021. - - balanced by IPRP 2024-2033
43 - Relaks, Vinjani nn, Posušje WPP Oštrc, 29,8 MW 06-1489-1/22 12.10.2023. - - balanced by IPRP 2024-2033
44 - Vjetroelektrana Grebak, Nevesinjskih ustanika 68, Nevesinje WPP Grebak, 66 MW 1293-3/21 03.05.2023. - - balanced by IPRP 2024-2033
45 - VE Ivovik, Maršala Tita 30/IV, Sarajevo WPP Ivovik, 84 MW 428-2/21 27.12.2022. - - balanced by IPRP 2024-2033
46 - Vjetropark Interwind, Hadželi 129, Sarajevo WPP Ivan sedlo, 25 MW 1042-3/21 28.10.2021. - - balanced by IPRP 2024-2033
47 - FL Wind, Eminovo selo nn, Tomislavgrad WPP Tušnica, 72,6 MW 06-220-3/24 22.05.2022. - - balanced by IPRP 2024-2033
48 - Imres, Župana Želimira nn, Livno WPP Široka Draga, 125,4 MW 06-1214-2/22 29.11.2023. - - balanced by IPRP 2024-2033
49 - Vjetroelektrane, Junuza Duruta nn, Glamoč WPP Dževa, 46 MW 06-743-2/22 12.07.2022. - - balanced by IPRP 2024-2033
50 - EFT SE Bileća, Srpske vojske 9, Bileća SPP Bileća, 55 MW 1045-1/21 27.04.2023. - - electric power producer
51 - SE Trebinje 1, Stepe Stepanovića nn, Trebinje SPP Trebinje 1, 118,8 MW 709-3/21 12.03.2024. - - new power 118,8 MW
52 - ECO-WAT, Josipa Bana Jelačića nn, Kiseljak SPP Eco-Wat, 92,47 MW 376-1/22 04.05.2023. - - electric power producer 57 MW
53 - Pozitron, Ortiješ nn, Mostar SPP Polog 1-8, 7,99 MW 06-800-3/22 27.04.2023. - - balanced by IPRP 2024-2033
54 - Plavo Sunce, Tromeđa II 3, Čitluk SPP Plavo Sunce, 40 MW 06-800-3/22 08.11.2023. - - balanced by IPRP 2024-2033
55 - ASTERA, Šušnjari nn, Posušje SPP Astera, 25 MW 06-742-2/22 10.08.2023. - - balanced by IPRP 2024-2033
56 12.12.2023. PLC EP HZHB, Mostar, Kralja Petra Krešimira IV 6-A SPP EP HZHB1, 150 MW 06-1019-1/23 21.07.2023. Connection conditions, Energy permit ED-1864/23 - -
57 11.01.2024. AURORA SOLAR Ltd, Stolac, Kneza Domagoja nn SPP Stolac solar 01-1 to 01-22, 103,15 MW 06-546-1/23 11.05.2023. Connection conditions, Energy permits from ED-1664/23 to ED-1685/23 - -
58 12.01.2024. MET Consulting Ltd, Široki Brijeg, Trnska cesta 146 SPP Zvizdan, 28,5 MW 06-827-2/23 30.05.2023. Connection conditions, Energy permit ED-1707/23 - electric power producer
59 16.01.2024. ENERSTATE Ltd, Sokolac, Jove Jankovića nn SPP Sokolac, 100,8 MW 06-1103-3/23 02.08.2023. Connection conditions, Concession contract 05.05/360-219-33/22 - -
60 27.02.2024. ETMAX Ltd, Banja Luka, Poslovna zona Ramići nn SPP Nevesinje, SPP Nevesinje 1-14, MDD Energy, M Solar, 570 MW 06-114-3/24 27.01.2023. Connection conditions, Concession contract March and October 2023 - -
61 08.03.2024. Pozitron Ltd, Mostar, Ortiješ nn SPP Liwno 1 - SE Liwno 6, 27 MW 06-1120-3/23 08.01.2023. Energy permits from ED-1869/24 to ED-1874/24 - -
62 26.03.2024. B&B sunce vjetar Ltd, Banja Luka, Bulevar srpske vojske 17 SPP and WPP Planik 80+36 MW 06-259-3/24 13.03.2024. Connection conditions, Concession contracts 05.05/360-161-60/21 and 05.05/360-161-61/21 - -
63 29.03.2024. DELING INVEST Ltd, Tuzla, Šići nn SPP DELING INVEST 1, 29,75 MW 06-1956-2/23 17.01.2024. Connection conditions, Energy permit ED-1909/24 - electric power producer
64 01.04.2024. FOTONAPONSKA ELEKTRANA 2 Ltd, Trebinje, Stepe Stepanovića nn SPP Trebinje 2, 48,7 MW 06-335-3/24 12.03.2024. Connection conditions, Contract on Assignment of Concession contract, Concession contract 05.05/012-1664-41/20 - -
65 04.04.2024. Solario Ltd, Mostar, Dubrovačka 134A SPP Solario 1 and 2, 4 + 4 MW + 11, 4378 MW (power plants less than 1 MW) 06-678-2/23 05.06.2023. Energy permits ED-1894/24 and ED-1895/24, Declarations of unnecessity of an energy permit for power plants less than 1 MW - -
66 13.05.2024. TPC Ltd Sarajevo, Avdage Šahinagića 9/1 SPP TOP PRO 1-4, 3 MW (power plants less than 1 MW) 06-535-1/24 11.04.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW - -
67 14.05.2024. SOLARIO Ltd Mostar, Dubrovačka 134A SPP Solario 3-12, 9,99 MW (power plants less than 1 MW) 06-684-1/24 10.05.2024. Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW - -
68 24.05.2024. HL 001 Group Ltd Mostar, Braće Fejića nn SPP HL 31-60, 29,7 MW (power plants less than 1 MW) 06-799-2/24 22.05.2024. Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
69 11.07.2024. SOLARNI VJETAR Ltd Mostar, Ortiješ nn SPP Solarni vjetar 1-12, 60 MW 06-1819-1/23 08.02.2024. Connection conditions, Energy permits from ED-1897/24 to ED-1908/24 - -
70 11.07.2024. NSOL Ltd Mostar, Vukovarska nn SPP Brotnjo 1 and 2, 9,98 MW 06-1603-3/23 04.12.2023. Connection conditions, Energy permits ED-1913/24 and ED-1914/24 - -
71 18.07.2024. ECCO SOLAR ENERGY Ltd Čitluk, Broćanski trg 1 SPP MI SOLIS 1-36, 35,64 MW (power plants less than 1 MW) 06-1011-2/24 17.07.2024. Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
72 18.07.2024. IM SUNCE Ltd Čitluk, Broćanski trg 1 SPP MI SOLIS 37-42, 5,94 MW (power plants less than 1 MW) 06-1011-2/24 17.07.2024. Connection conditions, Declarations of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
73 23.07.2024. PLC EP HZHB, Mostar, Kralja Petra Krešimira IV 6-A WPP Poklečani, 132MW 06-1149-3/23 10.07.2024. Amendment to the Connection conditions, Energy permit ED-00001-V-I-3/24 - -
74 23.07.2024. Energy of the future Ltd Bijeljina SPP Bileća - Solar 1, 128,7MW 06-455-1/24 27.03.2024. Connection conditions, Concession contract 05.05/012-612-9/24 - -
75 29.07.2024. PLC Komunalno Ltd Mostar, Zagrebačka 2 SPP MO SOLAR 1-10, 49,9 MW 06-1117-3/23 29.04.2024. Connection conditions, Energy permits from ED-1915/24 to ED-1924/24 - -
76 02.08.2024. PLC Elektroprivreda Bosne i Hercegovine, Sarajevo, Vilsonovo Šetalište 15 SPP Gračanica 1 and 2, 2 x 22,5 MW 06-352-3/24 21.05.2024. Connection conditions, Energy permit 05-13-1-24/24 - -
77 12.08.2024. ECO-WAT, Josipa Bana Jelačića nn, Kiseljak SPP F1 and F4, 2 x 0,999 MW 06-200-2/24 29.01.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW - -
78 23.08.2024. RWP VITOROG Ltd Glamoč, Oštrin brijeg 24 WPP Škadimovac, 110 MW 06-814-1/23 24.07.2023. Energy permit ED-1882/24 - -
79 26.08.2024. ECO-WAT, Josipa Bana Jelačića nn, Kiseljak SPP F2 and F3, 2 x 4,9992 MW 06-200-2/24 29.01.2024. Connection conditions, Energy permits ED-1910/24 and ED-1911/24 - -
80 03.09.2024. MAJSKO SUNCE Ltd Čitluk, Broćanski trg 1 SPP MAJSKO SUNCE 3-11 and 13, 9,54 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
81 03.09.2024. IM SUNCE Ltd Čitluk, Broćanski trg 1 SPP LUCIA 1 and 2, 1,29 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
82 03.09.2024. ECCO SOLAR ENERGY Ltd Čitluk, Broćanski trg 1 SPP ESE 1-36, 35,64 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than1 MW, Urban permits - -
83 03.09.2024. PREMIER ENERGY Ltd Čitluk, Kralja Tomislava 47 SPP PE 1-9, 8,91 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
84 04.09.2024. SOLARKO Ltd Čitluk, Broćanski trg 1 SPP SOLARKO 1-6, 5,94 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urban permits - -
85 04.09.2024. MS POWER Ltd Sarajevo, Hamze Čelenke 56 SPP SOLE 1-5, 4,95 MW (power plants less than 1 MW) 06-1422-3/24 03.09.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW, Urbani permits - -
86 06.09.2024. ACIS BH Ltd Sarajevo, Derviša Numića 50 SPP ACIS 2, 0,99 MW 06-290-3/24 08.03.2024. Connection conditions, Declaration of unnecessity of an energy permit for power plants less than 1 MW - -
87 09.09.2024. Solar Lena Ltd Grude, Blage Zadre 3 SPP Lena 2, 75 MW 06-1026-2/23 24.08.2023. Connection conditions, Energy permit ED-1891/24 - -
88 11.09.2024. MAJD 2 Ltd Ljubuški, Vukovarska 14 SPP Gaj 1 and 2, 4,1028 + 3,4801 MW 06-176-1/24 12.03.2024. Connection conditions, Energy permits 05-13-1-341/24 and 05-13-1-342/24 - -
89 11.09.2024. INOVACIJE Ltd Ljubuški, Klobuk 177 SPP Kravice 1 and 2, 18 + 26 MW 06-1831-3/23 05.02.2024. Connection conditions, Energy permits 05-13-1-343/24 and 05-13-1-344/24 - -
90 01.10.2024. IM SUNCE Ltd Čitluk, Broćanski trg 1 SPP IM SUNCE 2-3, 21-25 and SPP TERA 1-3, 36,851 MW 06-1117-3/23 08.03.2024. Connection conditions, Energy permits 05-13-1-382/24 do 05-13-1-391/24, Urban permits - -
91 01.10.2024. H&L "001" Ltd Mostar, Braće Fejića nn SPP HL 1-12, 54 MW 06-934-3/23 02.08.2023. Connection conditions, Energy permits 05-13-1-347/24 do 05-13-1-358/24, Urban permits - -
92 09.10.2024. Bioenergos TTS Ltd Banja Luka, Bulevar srpske vojske 17 SPP Borike, 232,2 MW 06-862-1/24 07.06.2024. Connection conditions, Decision of the Government of the Republic of Srpska - -