﻿<?xml version="1.0" encoding="utf-8"?>
<AuctionSummary>
  <AuctionCode>BA-RS-D-20261112</AuctionCode>
  <AuctionStarted>2026-11-11T09:00:00.0042441+01:00</AuctionStarted>
  <AuctionEnded>2026-11-11T09:30:00.0157618+01:00</AuctionEnded>
  <ProductInstanceSummaries>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_01H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>385</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>21</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_02H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>389</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_03H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>407</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_04H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>411</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_05H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>401</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_06H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>377</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>21</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_07H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>375</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>21</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_08H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>345</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_09H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>91.14</MarginalPrice>
      <MarginalPricePerMegawatt>91.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>115</TotalOfferedQty>
      <TotalBidQty>353</TotalBidQty>
      <TotalAllocatedQty>115</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_10H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>114</TotalOfferedQty>
      <TotalBidQty>361</TotalBidQty>
      <TotalAllocatedQty>114</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_11H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>113</TotalOfferedQty>
      <TotalBidQty>371</TotalBidQty>
      <TotalAllocatedQty>113</TotalAllocatedQty>
      <TotalBidsCount>23</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_12H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>113</TotalOfferedQty>
      <TotalBidQty>372</TotalBidQty>
      <TotalAllocatedQty>113</TotalAllocatedQty>
      <TotalBidsCount>23</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_13H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>114</TotalOfferedQty>
      <TotalBidQty>375</TotalBidQty>
      <TotalAllocatedQty>114</TotalAllocatedQty>
      <TotalBidsCount>23</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_14H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>114</TotalOfferedQty>
      <TotalBidQty>367</TotalBidQty>
      <TotalAllocatedQty>114</TotalAllocatedQty>
      <TotalBidsCount>23</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_15H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>114</TotalOfferedQty>
      <TotalBidQty>358</TotalBidQty>
      <TotalAllocatedQty>114</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_16H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>413</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>25</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_17H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>417</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>23</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_18H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>115</TotalOfferedQty>
      <TotalBidQty>405</TotalBidQty>
      <TotalAllocatedQty>115</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_19H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>401</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_20H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>405</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_21H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>401</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>21</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_22H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>124.14</MarginalPrice>
      <MarginalPricePerMegawatt>124.14</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>408</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>3</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_23H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>85.6</MarginalPrice>
      <MarginalPricePerMegawatt>85.6</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>403</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_24H_12</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>85.6</MarginalPrice>
      <MarginalPricePerMegawatt>85.6</MarginalPricePerMegawatt>
      <TotalOfferedQty>108</TotalOfferedQty>
      <TotalBidQty>402</TotalBidQty>
      <TotalAllocatedQty>108</TotalAllocatedQty>
      <TotalBidsCount>22</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>4</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_01H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_02H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_03H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_04H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_05H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_06H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>285</TotalBidQty>
      <TotalAllocatedQty>285</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_07H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>274</TotalBidQty>
      <TotalAllocatedQty>274</TotalAllocatedQty>
      <TotalBidsCount>17</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_08H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>273</TotalBidQty>
      <TotalAllocatedQty>273</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_09H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>285</TotalOfferedQty>
      <TotalBidQty>265</TotalBidQty>
      <TotalAllocatedQty>265</TotalAllocatedQty>
      <TotalBidsCount>14</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_10H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>286</TotalOfferedQty>
      <TotalBidQty>266</TotalBidQty>
      <TotalAllocatedQty>266</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_11H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.04</MarginalPrice>
      <MarginalPricePerMegawatt>0.04</MarginalPricePerMegawatt>
      <TotalOfferedQty>287</TotalOfferedQty>
      <TotalBidQty>348</TotalBidQty>
      <TotalAllocatedQty>287</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_12H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>287</TotalOfferedQty>
      <TotalBidQty>335</TotalBidQty>
      <TotalAllocatedQty>287</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_13H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>286</TotalOfferedQty>
      <TotalBidQty>326</TotalBidQty>
      <TotalAllocatedQty>286</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_14H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>286</TotalOfferedQty>
      <TotalBidQty>312</TotalBidQty>
      <TotalAllocatedQty>286</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_15H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>286</TotalOfferedQty>
      <TotalBidQty>313</TotalBidQty>
      <TotalAllocatedQty>286</TotalAllocatedQty>
      <TotalBidsCount>17</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_16H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>273</TotalBidQty>
      <TotalAllocatedQty>273</TotalAllocatedQty>
      <TotalBidsCount>16</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_17H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>272</TotalBidQty>
      <TotalAllocatedQty>272</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_18H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>285</TotalOfferedQty>
      <TotalBidQty>265</TotalBidQty>
      <TotalAllocatedQty>265</TotalAllocatedQty>
      <TotalBidsCount>14</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>5</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_19H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>272</TotalBidQty>
      <TotalAllocatedQty>272</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_20H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>272</TotalBidQty>
      <TotalAllocatedQty>272</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_21H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>272</TotalBidQty>
      <TotalAllocatedQty>272</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_22H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>282</TotalBidQty>
      <TotalAllocatedQty>282</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_23H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>284</TotalBidQty>
      <TotalAllocatedQty>284</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_24H_12</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-11-11T23:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-11-12T23:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0</MarginalPrice>
      <MarginalPricePerMegawatt>0</MarginalPricePerMegawatt>
      <TotalOfferedQty>292</TotalOfferedQty>
      <TotalBidQty>284</TotalBidQty>
      <TotalAllocatedQty>284</TotalAllocatedQty>
      <TotalBidsCount>15</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>6</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
  </ProductInstanceSummaries>
</AuctionSummary>