﻿<?xml version="1.0" encoding="utf-8"?>
<AuctionSummary>
  <AuctionCode>BA-RS-D-20261005</AuctionCode>
  <AuctionStarted>2026-10-04T09:00:00.0110295+02:00</AuctionStarted>
  <AuctionEnded>2026-10-04T09:30:00.0060718+02:00</AuctionEnded>
  <ProductInstanceSummaries>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_01H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>602</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>28</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_02H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>616</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_03H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>617</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_04H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>616</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_05H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>615</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_06H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.11</MarginalPrice>
      <MarginalPricePerMegawatt>0.11</MarginalPricePerMegawatt>
      <TotalOfferedQty>471</TotalOfferedQty>
      <TotalBidQty>605</TotalBidQty>
      <TotalAllocatedQty>471</TotalAllocatedQty>
      <TotalBidsCount>27</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_07H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.44</MarginalPrice>
      <MarginalPricePerMegawatt>0.44</MarginalPricePerMegawatt>
      <TotalOfferedQty>471</TotalOfferedQty>
      <TotalBidQty>661</TotalBidQty>
      <TotalAllocatedQty>471</TotalAllocatedQty>
      <TotalBidsCount>28</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_08H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.44</MarginalPrice>
      <MarginalPricePerMegawatt>0.44</MarginalPricePerMegawatt>
      <TotalOfferedQty>472</TotalOfferedQty>
      <TotalBidQty>695</TotalBidQty>
      <TotalAllocatedQty>472</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_09H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.71</MarginalPrice>
      <MarginalPricePerMegawatt>0.71</MarginalPricePerMegawatt>
      <TotalOfferedQty>472</TotalOfferedQty>
      <TotalBidQty>747</TotalBidQty>
      <TotalAllocatedQty>472</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_10H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>487</TotalOfferedQty>
      <TotalBidQty>780</TotalBidQty>
      <TotalAllocatedQty>487</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_11H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>487</TotalOfferedQty>
      <TotalBidQty>817</TotalBidQty>
      <TotalAllocatedQty>487</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_12H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>475</TotalOfferedQty>
      <TotalBidQty>829</TotalBidQty>
      <TotalAllocatedQty>475</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_13H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>475</TotalOfferedQty>
      <TotalBidQty>816</TotalBidQty>
      <TotalAllocatedQty>475</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_14H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>475</TotalOfferedQty>
      <TotalBidQty>805</TotalBidQty>
      <TotalAllocatedQty>475</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_15H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.69</MarginalPrice>
      <MarginalPricePerMegawatt>0.69</MarginalPricePerMegawatt>
      <TotalOfferedQty>475</TotalOfferedQty>
      <TotalBidQty>768</TotalBidQty>
      <TotalAllocatedQty>475</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_16H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.44</MarginalPrice>
      <MarginalPricePerMegawatt>0.44</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>738</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_17H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.25</MarginalPrice>
      <MarginalPricePerMegawatt>0.25</MarginalPricePerMegawatt>
      <TotalOfferedQty>486</TotalOfferedQty>
      <TotalBidQty>702</TotalBidQty>
      <TotalAllocatedQty>486</TotalAllocatedQty>
      <TotalBidsCount>29</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_18H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.44</MarginalPrice>
      <MarginalPricePerMegawatt>0.44</MarginalPricePerMegawatt>
      <TotalOfferedQty>451</TotalOfferedQty>
      <TotalBidQty>671</TotalBidQty>
      <TotalAllocatedQty>451</TotalAllocatedQty>
      <TotalBidsCount>30</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_19H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.83</MarginalPrice>
      <MarginalPricePerMegawatt>0.83</MarginalPricePerMegawatt>
      <TotalOfferedQty>451</TotalOfferedQty>
      <TotalBidQty>751</TotalBidQty>
      <TotalAllocatedQty>451</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_20H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.5</MarginalPrice>
      <MarginalPricePerMegawatt>1.5</MarginalPricePerMegawatt>
      <TotalOfferedQty>451</TotalOfferedQty>
      <TotalBidQty>816</TotalBidQty>
      <TotalAllocatedQty>451</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_21H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.77</MarginalPrice>
      <MarginalPricePerMegawatt>0.77</MarginalPricePerMegawatt>
      <TotalOfferedQty>451</TotalOfferedQty>
      <TotalBidQty>745</TotalBidQty>
      <TotalAllocatedQty>451</TotalAllocatedQty>
      <TotalBidsCount>33</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_22H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.44</MarginalPrice>
      <MarginalPricePerMegawatt>0.44</MarginalPricePerMegawatt>
      <TotalOfferedQty>451</TotalOfferedQty>
      <TotalBidQty>673</TotalBidQty>
      <TotalAllocatedQty>451</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_23H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.13</MarginalPrice>
      <MarginalPricePerMegawatt>0.13</MarginalPricePerMegawatt>
      <TotalOfferedQty>441</TotalOfferedQty>
      <TotalBidQty>608</TotalBidQty>
      <TotalAllocatedQty>441</TotalAllocatedQty>
      <TotalBidsCount>28</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>BA-RS_24H_05</ProductInstanceCode>
      <InAreaEicCode>10YCS-SERBIATSOV</InAreaEicCode>
      <OutAreaEicCode>10YBA-JPCC-----D</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.13</MarginalPrice>
      <MarginalPricePerMegawatt>0.13</MarginalPricePerMegawatt>
      <TotalOfferedQty>441</TotalOfferedQty>
      <TotalBidQty>605</TotalBidQty>
      <TotalAllocatedQty>441</TotalAllocatedQty>
      <TotalBidsCount>28</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_01H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.13</MarginalPrice>
      <MarginalPricePerMegawatt>0.13</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>624</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>33</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_02H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>595</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_03H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>595</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_04H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>595</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_05H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>595</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_06H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.13</MarginalPrice>
      <MarginalPricePerMegawatt>0.13</MarginalPricePerMegawatt>
      <TotalOfferedQty>529</TotalOfferedQty>
      <TotalBidQty>631</TotalBidQty>
      <TotalAllocatedQty>529</TotalAllocatedQty>
      <TotalBidsCount>33</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_07H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.2</MarginalPrice>
      <MarginalPricePerMegawatt>0.2</MarginalPricePerMegawatt>
      <TotalOfferedQty>529</TotalOfferedQty>
      <TotalBidQty>700</TotalBidQty>
      <TotalAllocatedQty>529</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_08H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.8</MarginalPrice>
      <MarginalPricePerMegawatt>0.8</MarginalPricePerMegawatt>
      <TotalOfferedQty>528</TotalOfferedQty>
      <TotalBidQty>796</TotalBidQty>
      <TotalAllocatedQty>528</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_09H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>5</MarginalPrice>
      <MarginalPricePerMegawatt>5</MarginalPricePerMegawatt>
      <TotalOfferedQty>528</TotalOfferedQty>
      <TotalBidQty>873</TotalBidQty>
      <TotalAllocatedQty>528</TotalAllocatedQty>
      <TotalBidsCount>35</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_10H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>5</MarginalPrice>
      <MarginalPricePerMegawatt>5</MarginalPricePerMegawatt>
      <TotalOfferedQty>513</TotalOfferedQty>
      <TotalBidQty>844</TotalBidQty>
      <TotalAllocatedQty>513</TotalAllocatedQty>
      <TotalBidsCount>35</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_11H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.37</MarginalPrice>
      <MarginalPricePerMegawatt>1.37</MarginalPricePerMegawatt>
      <TotalOfferedQty>513</TotalOfferedQty>
      <TotalBidQty>718</TotalBidQty>
      <TotalAllocatedQty>513</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>7</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_12H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.37</MarginalPrice>
      <MarginalPricePerMegawatt>1.37</MarginalPricePerMegawatt>
      <TotalOfferedQty>525</TotalOfferedQty>
      <TotalBidQty>730</TotalBidQty>
      <TotalAllocatedQty>525</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_13H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.37</MarginalPrice>
      <MarginalPricePerMegawatt>1.37</MarginalPricePerMegawatt>
      <TotalOfferedQty>525</TotalOfferedQty>
      <TotalBidQty>730</TotalBidQty>
      <TotalAllocatedQty>525</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_14H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.37</MarginalPrice>
      <MarginalPricePerMegawatt>1.37</MarginalPricePerMegawatt>
      <TotalOfferedQty>525</TotalOfferedQty>
      <TotalBidQty>730</TotalBidQty>
      <TotalAllocatedQty>525</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_15H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.83</MarginalPrice>
      <MarginalPricePerMegawatt>1.83</MarginalPricePerMegawatt>
      <TotalOfferedQty>525</TotalOfferedQty>
      <TotalBidQty>770</TotalBidQty>
      <TotalAllocatedQty>525</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_16H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.37</MarginalPrice>
      <MarginalPricePerMegawatt>1.37</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>719</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_17H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>1.7</MarginalPrice>
      <MarginalPricePerMegawatt>1.7</MarginalPricePerMegawatt>
      <TotalOfferedQty>514</TotalOfferedQty>
      <TotalBidQty>732</TotalBidQty>
      <TotalAllocatedQty>514</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_18H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.35</MarginalPrice>
      <MarginalPricePerMegawatt>0.35</MarginalPricePerMegawatt>
      <TotalOfferedQty>549</TotalOfferedQty>
      <TotalBidQty>711</TotalBidQty>
      <TotalAllocatedQty>549</TotalAllocatedQty>
      <TotalBidsCount>33</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_19H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>549</TotalOfferedQty>
      <TotalBidQty>656</TotalBidQty>
      <TotalAllocatedQty>549</TotalAllocatedQty>
      <TotalBidsCount>31</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_20H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.16</MarginalPrice>
      <MarginalPricePerMegawatt>0.16</MarginalPricePerMegawatt>
      <TotalOfferedQty>549</TotalOfferedQty>
      <TotalBidQty>701</TotalBidQty>
      <TotalAllocatedQty>549</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>9</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_21H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.34</MarginalPrice>
      <MarginalPricePerMegawatt>0.34</MarginalPricePerMegawatt>
      <TotalOfferedQty>549</TotalOfferedQty>
      <TotalBidQty>728</TotalBidQty>
      <TotalAllocatedQty>549</TotalAllocatedQty>
      <TotalBidsCount>32</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>8</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_22H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.13</MarginalPrice>
      <MarginalPricePerMegawatt>0.13</MarginalPricePerMegawatt>
      <TotalOfferedQty>549</TotalOfferedQty>
      <TotalBidQty>690</TotalBidQty>
      <TotalAllocatedQty>549</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_23H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>559</TotalOfferedQty>
      <TotalBidQty>657</TotalBidQty>
      <TotalAllocatedQty>559</TotalAllocatedQty>
      <TotalBidsCount>35</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>11</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
    <ProductInstanceSummary>
      <ProductInstanceCode>RS-BA_24H_05</ProductInstanceCode>
      <InAreaEicCode>10YBA-JPCC-----D</InAreaEicCode>
      <OutAreaEicCode>10YCS-SERBIATSOV</OutAreaEicCode>
      <CapacityContractType>A01</CapacityContractType>
      <DeliveryFrom>2026-10-04T22:00:00Z</DeliveryFrom>
      <DeliveryTo>2026-10-05T22:00:00Z</DeliveryTo>
      <LotQty>1</LotQty>
      <MarginalPrice>0.02</MarginalPrice>
      <MarginalPricePerMegawatt>0.02</MarginalPricePerMegawatt>
      <TotalOfferedQty>559</TotalOfferedQty>
      <TotalBidQty>678</TotalBidQty>
      <TotalAllocatedQty>559</TotalAllocatedQty>
      <TotalBidsCount>34</TotalBidsCount>
      <CapacityTradersWithAllocationsCount>10</CapacityTradersWithAllocationsCount>
    </ProductInstanceSummary>
  </ProductInstanceSummaries>
</AuctionSummary>